ArticlesApril 6, 2025PARTIAL DISCHARGE MONITORING SYSTEM IN 230KV GAS-INSULATED SUBSTATIONS: IMPLEMENTATION, INSIGHTS, AND OPERATIONAL GUIDELINES By: Farai Pasipamire – Fawaz A. Alghool – Saif M Otaibi – Abdulaziz M Otaibi – Majid K Aldhafeeri
ArticlesMarch 17, 2025Marjan Increment Projects Implements 2 By: Khalid M Al-Muwalid, Omar K. Akeel, Ali H. Al-Mohammed Ali and Carl van Vuuren
ArticlesMarch 17, 2025Written By: Fawaz A. Alghool – Saif M. Otaibi Abdulaziz M. Otaibi – Farai Pasipamire Majid K. Aldhafeeri 230 kV GIS Installation, Pre-Commissioning, and Energization Best Practices
ArticlesMarch 17, 2025Written By: Omar A. Sagar Optimizing Construction Project Management Through Advanced Engineering Practices
ArticlesMarch 12, 2025A new benchmark in the Offshore construction industry Long reach Offshore to Offshore HDD
ArticlesMarch 12, 2025Standardized Interface Matrix (SIM): Enhancing Multi-Contractor Coordination in Large-Scale Project, By: Ahmed A. Alghamdi, Abdullah H. Essa, Saud S. Khair