April 6, 20250CommentsBest Practices for Managing Pre-FEED,FEED, and Construction Support By: Musab A. Alharbi – 2025
April 6, 20250CommentsEPC Contracts; Owner and Bidders Prospective By: Ammar Jahlan – Khaled Abumelha
April 6, 20250CommentsPARTIAL DISCHARGE MONITORING SYSTEM IN 230KV GAS-INSULATED SUBSTATIONS: IMPLEMENTATION, INSIGHTS, AND OPERATIONAL GUIDELINES By: Farai Pasipamire – Fawaz A. Alghool – Saif M Otaibi – Abdulaziz M Otaibi – Majid K Aldhafeeri
March 17, 20250CommentsMarjan Increment Projects Implements 2 By: Khalid M Al-Muwalid, Omar K. Akeel, Ali H. Al-Mohammed Ali and Carl van Vuuren
March 17, 20250CommentsWritten By: Fawaz A. Alghool – Saif M. Otaibi Abdulaziz M. Otaibi – Farai Pasipamire Majid K. Aldhafeeri 230 kV GIS Installation, Pre-Commissioning, and Energization Best Practices
March 17, 20250CommentsWritten By: Omar A. Sagar Optimizing Construction Project Management Through Advanced Engineering Practices
March 12, 20250CommentsA new benchmark in the Offshore construction industry Long reach Offshore to Offshore HDD
March 12, 20250CommentsStandardized Interface Matrix (SIM): Enhancing Multi-Contractor Coordination in Large-Scale Project, By: Ahmed A. Alghamdi, Abdullah H. Essa, Saud S. Khair